Application Temperature Above 50°F.
Assembly Time After Glue Application 0-5 minutes (70°F./50% RH)
Method of Application Compatible with most U.S.-made doweling machines. See your machine’s manual for details.
Cleanup Damp cloth while glue is wet. Scrape off and sand dried excess.